by
Edward Dewhurst
Protection Study
Barrow in Furness Hospital
SPE was contracted by Edward Dewhurst Ltd, to carry out a protection study for a planned major refurbishment of the Barrow-in-Furness hospital.
SPE’s scope included organising a site survey for the existing protection devices, and equipment; reviewing the proposed SLDs to ensure that sufficient reliability was maintained in the emergency system, before creating a model of the whole electrical system in ETAP. Once the ETAP model was created, a number of different protection coordination cases were carried out for the normal and emergency operation cases.
Key Features
Client: Edward Dewhurst
Industry: Building Services
Plant Type: Hospital
Project: Power System Studies
Contract: Lump Sum
Date: 2018
“SPE was appointed to undertake a fault study and protection coordination study for an upgrade of an existing hospital.”