SPE was contracted by SS&A to help develop a new 24MW, 33kV Battery Energy Storage Site (BESS) at Halewick Lane. The site had a common incoming 33kV, 24MW supply, that was then split into two sub-feeders, to supply different area developers. SPEs scope included development of the overall cable route, cable routing drawings, preliminary SLDs and development of the ICP scope documentation.

Contact Us

Key Features

Client: SS&A
Industry: Renewables
Plant Type: Battery Storage
Project: Concept Design
Contract: Lump Sum
Date: 2020

“SPE carried out a detailed concept selection study, including preparation of SLDs, cable route and ICP scope documents.”